Tuesday, 30 November 2010
Saturday, 27 November 2010
Tuesday, 23 November 2010
Thursday, 18 November 2010
Tuesday, 16 November 2010
Wednesday, 10 November 2010
Filming Schedule-Time Schedule;
10am-
- Health and Safety Video
- Prop/Costume Video
- Setting the scene up.
11am-
- Filming commences
- Beginning and End shot (if weather permits)
- Film shots 1-5
12pm-
- Collect other actors (Michael Summers, Callum Herbert)
- Shots 7-8 (if actors avaliable)
- Shots 9-11 as normal
1pm-
- TEA BREAK
- Reflection on filming so far
1.30pm-
- Shots 12-14
2.30pm-
- Wrap up/Reflection on days filming
3.00pm-
- End of filming
Filming Schedule- Weather & Equipment;
Filming Will Commence On: Sunday 14th November
Equipment: 2x cameras, 2x tripods, 2x camera tapes
Weather:
Good weather conditions, temperature is perfect for filming. However the wind is a little slower than what we orginally wanted therefore we will have to film the beginning and last shot over a longer length of time.
Equipment: 2x cameras, 2x tripods, 2x camera tapes
Weather:
![](https://blogger.googleusercontent.com/img/b/R29vZ2xl/AVvXsEh8OQ3TKii5ME4tiDXkmRsyPnd2oI8fuugb_SmDSwVnBwKHrYApuIGCq9YERn0TganpFq2pSxIYJuefSwdz-G__55TUdfJD9C0m_pTbZtqjwNPRVzjPRX4tQjNz8fLkFmYkCQqKPh4tkmI/s200/weather.bmp)
Subscribe to:
Posts (Atom)